Performance Structure

Construction name Installation Dates Installation Institutions Details of construction
Yubudo 2022-01-25 Seocheon-si Civil engineering and construction work
Daecheon Port 2022-06-02 Boryeong-si Construction of Heterogeneous Bujan Bridge
Seogen Port 2022-06-15 Namhae-gun The construction of a bridge over a bridge
Hwacheon Port 2022-05-27 Namhae-gun Maintenance of berthing facilities
Booyoon 1 2022-06-21 Changwon-si-si The construction of a bridge over the bridge
Sirak Port no.2 2022-09-02 Changwon-si-si Civil engineering work
Changwon-si-si Port 2022-07-26 Changwon-si-si The construction of a bridge over the bridge
Jukdo Port 2022-08-02 Boryeong-si Civil engineering work
Anheung Foreign Port 2022-08-09 Taean-gun The construction of a bridge over the bridge
Jarando 2022-08-18 Goseong-gun Construction of the Mooring of the Bridge of Taoism
Namdang Port 2022-10-05 Boryeong-si Water intake pipe-related construction
Waseong Port 2022-10-05 Changwon-si Manufacturing and delivery of Bujan Bridge
Hongwon Port 2022-10-14 Seocheon-si Anchor installation
Wando-gun(Soan-myeon, Imok, Mira) 2022-09-29 Wando-gun Construction of Bujan Bridge
Yangjimal Port, Gyeongsangnam-do, Geoje-si 2022-09-19 Geoje-si Manufacture and installation of a map for
the construction of Bujan Bridge
Reinforcement of Buoyant
Strength of Guido Bridge
2022-09-22 Geoje-si Bujan Bridge Buoyancy Works
Jungpyeong Port 2022-09-22 Hadong-gun Construction of Bujan Bridge
Guyeong Port 2022-10-24 Geoje-si Construction of Bujan Bridge
Gu Woo-jin Port 2022-10-27 Sacheon-si Down payment of KRW 20,000,000
Jungchon Port 2022-10-31 Sacheon-si Construction of Bujan Bridge
Yokji, Dumi, Tongyeong-si-si 2022-12-02 Tongyeong-si The construction of the Bujan Bridge
Geunpo Port 2022-12-09 Tongyeong-si Upper structure (view line) installation service